Kitsap County road work update, June 4 – 8

KITSAP — Work continues on roads through out the county, the following is the latest update on the road work happening around Kitsap County from June 4 through June 8.

Road work can change due to weather conditions, material, equipment or crew availability.

South Kitsap Area

Road maintenance crews are doing general road maintenance at several locations in South Kitsap, be on the look out for flaggers that are directing motorists around the work, short delays of less than five minutes are expected in the immediate vicinity of the work.

Construction continues on Bethel Burley Rd SE at the intersection with SE Burley Olalla Rd.

A portion of Colchester Drive SE, between Yukon Harbor Road SE and Miracle Mile Drive E, is closed to through traffic 7 a.m. to 5 p.m. while a new sewer conveyance system is constructed. Local residents are able to access their property during the closure, but can expect delays in doing so. A detour route is in place. Visit the Yukon Harbor Sewer Extension project page for more information including the traffic plan.

City of Port Orchard

Tremont Construction – The City of Port Orchard is making improvements to the Tremont Street corridor. Visit the project page for the latest news about delays and detours getting to and from the Courthouse campus and other County offices.

Central Kitsap Area

Crews are working on pre-leveling and paving at the following locations, significant delays of 10 minutes or more are expected in the vicinity of the work. Use alternate routes if possible.

Monday, June 4 – Riddell Road NW between May Street NW and Bunker Street NW

Tuesday, June 5 – NW Breeze Way between NW Linden and the end

Tuesday, June 5 – NW Linden Lane between Dyes Inlet Road NW and the end

Wednesday, June 6 – W. Sherman Heights Road between W Shipview Court and Kent Avenue W

Thursday, June 7 – Clover Blossom Lane NE between Townsend Lane NE and the end

Construction continues on Silverdale Way NW from 600’ south of Byron to Anderson Hill Road. Expect Intermittent delays in the immediate vicinity of the work. Flaggers will direct motorists through the work area. All businesses are open during construction, but expect some delay. Plan ahead or find alternate routes to minimize inconveniences. For more information about this project click here.

Expect moderate delays of 5-10 minutes on Ridgetop Boulevard NW between SR 303 and Quail Run Drive as work continues on an improvement project there. Flaggers direct motorists through the work area. More information about this project is available online on the project page.

North Kitsap Area

Crews are full-depth patching at the following locations, moderate delays of 5-10 minutes are expected in the immediate vicinity of the work. Flaggers will assist motorists through the work area.

Monday, June 4 – Gala Way NE between NE Mari and NE Lincoln

Tuesday, June 5 – Norum Road NE between Yoot Skut Road and Jacobson

Tuesday, June 5 – Tuk Wil La between Norum and Lemolo Shore

Thursday, June 7 – Port Gamble Road NE between Bond and SR 104

Thursday, June 7 – Port Gamble Road NE between NE Minder and Bond.

Washington Boulevard NE has a 10,000 pound weight limit in effect.

Road work upcoming from June 18 – July 3

Johnson Way NE and Peterson Way NE – 24/7 closures planned from June 18 to July 3 for a utility project to replace a flow meeting located in the right-of-way. More information is available at the project page online.